Client: NextEra Energy Resources
White Hills is a 349 MW wind farm in Mohave County, Arizona. The 126 turbines were constructed on 39 square miles of public land administered by the Bureau of Land Management.
dk Engineering completed a topographic survey, boundary survey, ALTA survey, grading plans, erosion control plans, and construction staking services. dk Engineering designed over 59 miles of roadway for turbine deliveries and access. The civil design also included a bridge crossing for the Detrital Wash.