Client: NextEra Energy Resources
dk Engineering provided ongoing land surveying and construction staking services for the Wheatridge I and II Renewable Energy Facility project in Morrow County, Oregon.
The 51 square mile wind farm included 40+ miles of access roadway design and produces 300MW of renewable energy. dk Engineering designed 32 project entrances from County roads to the site.
The Wheatridge Solar Farm includes a 500-MW photovoltaic solar energy generation facility with battery storage. dk Engineering provided services such as surveying, construction staking, boundary and topographic surveys on the 1,050 acre site.