Client: City of Antioch
dk Engineering completed the 2.4 miles of Slatten Ranch Road preliminary plan line design and precise alignment study for the City of Antioch, along with the reestablishment of the East Lone Tree Specific Plan Phase II Benefit District. An Engineer’s Report, along with a cost sharing agreement, was developed for the remaining East Lone Tree Specific Plan and its associated backbone infrastructure.
By optimizing the design through collaboration with multiple agencies, jurisdictions, and other design consultants, dk Engineering saved the project over $5 million.