dk Engineering is currently processing the Laurel Road and associated infrastructure project in Antioch, California. This project completes the Laurel Road connection to the existing State Route 4 Bypass, providing much needed circulation within the City, which will alleviate much of the existing traffic delays at other State Route 4 connections.
The backbone infrastructure is based on the cost sharing agreement and East Lone Tree Specific Plan Phase II Benefit District previously proposed by dk Engineering. These utility projects essentially complete the regional project, which will benefit a significant portion of the city.