Palm Springs Repower

Palm Springs, CA

Client: NextEra Energy, Windpower Partners 1993 LP

The Palm Springs Repower project replaced old turbines with 33 new 1.5MW turbines. dk Engineering worked with NextEra to microsite the turbines and provide the certificate of location. In addition, dk assisted NextEra’s legal department with title work, FAA certification and processing.

dk Engineering provided topographic survey, boundary survey, ALTA survey, and construction staking services.